The continuing review of clinical trials has to address "good news" issues. Does one arm
of the study show substantially better efficacy? Does one arm of the study have a
significantly better safety profile? There are rigorous and well accepted approaches for
determining partway through a clinical trial whether one arm has a greater proportion of
cured patients or a smaller proportion of harmed patients.
Continuing review also has to address "bad news" issues. Is the study falling behind
schedule on its planned enrollment rates? Are patients dropping out of the study at an
alarming rate? Are certain adverse drug reactions occurring at an unexpected rate?
The analysis of "bad news" issues is more poorly developed. Often decisions about
these issues are based on subjective opinions and ad hoc rules. Statistical process control
charts and Bayesian statistical methods offer an approach to treat on-going review of rates
not tied directly to an efficacy or safety comparison.
Consider a hypothetical research study that started in January 1997 with the intention to
recruit 12 patients per year (one per month) over a ten year period, for a total sample size
of 120 patients. By the end of June 2004, (roughly 7 1/2 years), the study has enrolled 42
patients (Table 1).
02/26/1997 04/04/1997 07/07/1997
07/25/1997 02/05/1998 02/15/1998
03/06/1998 07/03/1998 08/03/1998
02/08/1999 03/19/1999 04/20/1999
05/29/1999 06/21/1999 07/27/1999
09/06/1999 01/10/2000 01/11/2000
02/28/2000 03/03/2000 04/13/2000
05/30/2000 11/21/2000 12/18/2000
02/06/2001 04/30/2001 08/03/2001
01/20/2001 12/03/2001 12/07/2001
09/27/2002 10/01/2002 02/02/2003
03/03/2003 10/31/2003 11/04/2003
11/11/2003 01/05/2004 02/02/2004
04/15/2004 05/23/2004 06/02/2004
Table 1. List of accrual dates.
Clearly this clinical trial has problems. The actual accrual rate is a meager 5.6 patients
per year, and now it is probably too late to fix things. In order to finish on time, the
researchers would have to recruit at a rate more than 30 patients per year over the remainder
of the study. This is more than 5 times faster than the current accrual rate and 2.5 times
faster than the original planned accrual rate.
Wouldn't it be nicer if the researcher had noticed the problem two years into the study
rather than 7 1/2 years out? The researcher would still have to hustle, but 14 patients per
year would allow the study to still finish on time and it represents only a modest increase
over the planned rate.
The traditional approach to examining rates is to set a time interval (weeks, months, or
years, for example) and count the number of events per that time interval. For example, you
could compute the monthly rates
Jan97 0
Feb97 1
Mar97 0
Apr97 1
May97 0
Jun97 0
Jul97 2
etc.
Or the yearly rates
1997 4
1998 5
1999 7
2000 8
etc.
or something in between like the quarterly rates
97Q1 1
97Q2 1
97Q3 2
97Q4 0
98Q1 3
etc.
A narrow time interval allows you to respond very rapidly, but the individual values
(mostly zeros and ones) are so limited that the information value of this approach may be
limited. The yearly approach has more information for any single time interval, but if you
have to wait a full year or more to spot any important changes. A quarterly interval offers
the best (worst?) of both worlds.
I am proposing a different approach that looks not at the events per time interval but
rather the time interval per event. Start by calculating the date gap: the amount of time
between successive events. The trial started on on January 1 and recruited the first two
patients on February 26 and April 4. The gap between the start of the study and the first
patient is 46 days and the gap between the first and second patients is 37 days. A plot of
the date gaps for the entire study appears below:

Note that the vertical axis shows a mixture of time units. This was done intentionally to
emphasize one of the biggest advantages of the date gap approach. Date gaps are self scaling
and automatically configure themselves appropriately. If events occur frequently, the data
will fit in the portion of the vertical axis where units are measured in days or weeks. If
the events occur rarely, the data will fit in the portion of the graph where units are
measured in months, quarters, or even years.
The date gap has a second important advantage. Each time a patient is recruited into the
trial, another point appears on the chart. When you count the number of events per time
interval, you have to wait until the end of that time interval before you can plot an
additional data point. By recasting accrual rates in terms of the number of days between
successive patients, we have liberated this problem from arbitrary calendar boundaries.
An important unsolved question is how to set control limits properly for a chart with
highly skewed data. The control limits is traditionally divided into zones, but for this data
set, some of the zones are in the negative territory. This suggests that perhaps the control
limits should be set using an asymmetric rule, that the traditional use of zones in a control
chart should be modified for skewed data, or possibly both. Another intriguing possibility is
to transform the data prior to computing control limits.
Another intriguing prospect is to apply a CUSUM chart to this technique. An accrual rate
of one per month implies an average date gap of 30 days. If you plot the cumulative sum of
the deviations of each individual date gap from the target of 30 days you get the following
chart.

The data has shown a clear and consistent problem from the very first date gap. After 10
patients, the study is more than a year behind schedule. While there are a few places where
the accrual seems to be making up for lost time, more often than not, the study is falling
further and further behind. The decision rules for CUSUM charts are not very well defined and
we are investigating a Bayesian approach.
02/26/1997 04/04/1997 07/07/1997
07/25/1997D 02/05/1998 02/15/1998
03/06/1998 07/03/1998 08/03/1998
02/08/1999 03/19/1999 04/20/1999D
05/29/1999 06/21/1999 07/27/1999
09/06/1999 01/10/2000 01/11/2000
02/28/2000D 03/03/2000D 04/13/2000
05/30/2000 11/21/2000 12/18/2000
02/06/2001D 04/30/2001 08/03/2001D
01/20/2001 12/03/2001 12/07/2001
09/27/2002 10/01/2002D 02/02/2003
03/03/2003 10/31/2003 11/04/2003
11/11/2003 01/05/2004 02/02/2004D
04/15/2004 05/23/2004D 06/02/2004
Table 2. List of accrual dates with dropouts designated by D.
For this problem, note that you had to recruit 4 patients before one dropped out, another
8 patients before the second dropped out, another 6 patients before the next one dropped out,
and so forth.
The gaps 4, 8, 7, 1, 5, 2, 5, 7, 2 can be plotted in sequence to look for trends. If the
drop out rate is accelerating, then the number of patients seen between each dropout is going
to be smaller.

The gray line in this graph is drawn at the mean. The mean of the gaps can be shown to be
equivalent to the number needed to harm (under the presumption, of course, that a drop-out
represents a harmful event).
07/08/2008.